THORChain Plans v3.21 Exploit Fix to Support Rujira Restart
Edited by Steinar Vigdel Kolnes, Editor, Oslo
THORChain is targeting an upgrade around Oct. 23 as Rujira prepares to seek a conditional 24-hour liquidation grace period for borrowers.

THORChain is preparing its v3.21 upgrade with a fix for an exploit, aiming to support a restart of Rujira, according to The Defiant.
The upgrade is scheduled for block 28,366,100, expected around Oct. 23. Its timing is tied to when the network reaches that block.
Rujira also plans to request a conditional 24-hour grace period on borrower liquidations. The proposal remains a planned request, rather than a confirmed measure.
Source: The Defiant



